Schedule-resource Trade-off Modeling and Application based on 4D-BIM

Journal of Information Technology in Civil Engineering and Architecture, 2014

Recommended citation: Lin, J.*, Zhang, J., Zhong, Y. (2014). Schedule-resource Trade-off Modeling and Application based on 4D-BIM. Journal of Information Technology in Civil Engineering and Architecture, 6(6), 44-49. doi: 10.16670/j.cnki.cn11-5823/tu.2014.06.009 (in Chinese) http://doi.org/10.16670/j.cnki.cn11-5823/tu.2014.06.009 cited by count

Abstract

According to the key requirements in schedule and resource management during construction, an approach for schedule-resource trade-off problem was established based on 4 Dimensional Building Information Model (4D-BIM) proposed by Tsinghua.With the transforming mechanics between 4D-BIM and Discrete Event Simulation model, schedule-resource trade-off model can be achieved automatically.In addition, the paper explores and analyses the process of SA algorithm in order to tackle the schedule-resource trade-off.The whole solution was applied to a real project and illustrated a good result.The result indicates that the automatic schedule-resource tradeoff modelling can free people from intensive work, and reduces repetitive work, which provides managers with a practical tool for schedule arrangement and resource allocation.

Download paper here

Download preprint here

Financial Sources:

Leave a Comment