Automating Closed-Loop Structural Safety Management for Bridge Construction through Multisource Data Integration

Advances in Engineering Software, 2019

引用方式: Lin, J., Zhang, J., Zhang, X., Hu, Z.* (2019). Automating Closed-Loop Structural Safety Management for Bridge Construction through Multisource Data Integration. Advances in Engineering Software, 128, 152-168. doi: 10.1016/j.advengsoft.2018.11.013 https://www.sciencedirect.com/science/article/pii/S0965997818306689 cited by count

摘要

Structural safety during construction is vital to engineering success of large scale bridges. However, difficulties in time-dependent structural modeling and data fragmentation of different engineering and management systems remain unresolved, hindering the plan, do, check, and adjust (PDCA) loop for structural safety management during bridge construction. In this paper, an integrated framework for closed-loop management of structural safety based on multisource data integration is presented. The proposed framework consists of a bridge safety information model (BrSIM), algorithms for data integration and semi-automatic time-dependent structural model generation, and methods for structural safety warning and assessment. The proposed BrSIM and algorithms integrate data related to 3D products, schedule, structural simulation and monitoring from various engineering systems, which covers the main data for structural safety management during construction. Meanwhile, automatic calculation and generation of static loads and constraints of a structural model based on 3D product information and monitoring data are also considered. Demonstration in the construction of a long-span bridge shows that with the proposed framework, it is possible to visualize the construction process, generate time-dependent structural models and simulate, monitor and assess the structural safety dynamically. Thus, the structural safety management loop is automated and fully closed. Furthermore, by tracking and simulating the changes of structural performance over time, and comparing the difference between simulation results and monitoring data, earlier detection and better evaluation of potential structural risks are achieved. Moreover, efficiency of information modeling and sharing is improved and effective management and decision-making are achieved with the proposed approach.

论文下载链接

预印本下载链接

有关学术报告

This research is supported by the National Key R&D Program of China (No. 2016YFC0702107), the National Natural Science Foundation of China (No. 51478249), the China Postdoctoral Science Foundation Grant (No. 2016M601038), the Young Elite Scientists Sponsorship Program by the China Association for Science and Technology (No. 2016QNRC001) and the Tsinghua University-Glodon Joint Research Centre for Building Information Model (RCBIM).

Accession Number: WOS:000465951900012

ISSN: 0965-9978

eISSN: 1873-5339

IDS Number: HV4JF

相关项目资助情况:

发表评论